OEM PCB/PCBA Customized Manufacturer
Printed Circuit Board Assembly BOM List Gerber File Design High Quality
Why Choose Us
✔
Custom FPC/PCB bare board fabrication.
✔
One-stop electronic components assembly.
✔
Original Components Sourcing Agent Service.
✔
Quick delivery for prototype samples (1-2 weeks).
PCBA Technical Requirements
📌 Professional Surface-mounting and Through-hole soldering Technology
📌 Various sizes like 1206, 0805, 0603 components SMT technology
📌 ICT (In Circuit Test), FCT (Functional Circuit Test) technology
📌 PCB Assembly With UL, CE, FCC, RoHS Approval
📌 Nitrogen gas reflow soldering technology for SMT
📌 High Standard SMT & Solder Assembly Line
📌 High density interconnected board placement technology capacity
Product Specification
| Product |
Custom pcb & pcba & Original IC Electronic components |
| Base Material |
FR1~FR4/Aluminum/PI/CU |
| Board Thickness |
0.4mm-3.2mm (According to customer requirements) |
| Copper Thickness |
0.5oz, 1oz, 2oz, 3oz, 4oz |
| Layer |
1~58 Layers |
| Certificate |
ISO9001/RoHS/CE |
| Surface Finishing |
LeadFree HASL/Immersion Silver/ENIG |
| Solder mask color |
Green, Black, Red, Blue |
| Silkscreen |
Black, White |
| Note |
Please provide Gerber file and Bom List for quoting |
One-Stop Electronic Manufacturing Services
Frequently Asked Questions
1. What is one-stop service?
There are many components in a BOM list. It can be time-consuming to communicate with multiple suppliers. We provide all components together to streamline your purchasing process.
2. How long is the quality guarantee period?
The quality guarantee period is 12 months.
3. Do you provide alternative solutions?
Yes, we have a stable and reliable supply chain. We can recommend professional alternative components for customer approval to help save costs.
4. What is your standard lead time?
Our standard lead time for prototypes and samples is typically 2 weeks.
5. What is your Minimum Order Quantity (MOQ)?
We have no MOQ requirement. You can enjoy better pricing with larger order volumes.
6. Do I need to pay for the sample cost?
Sample costs are typically returned after a mass production order is confirmed.